{"id":394,"date":"2024-11-04T11:36:12","date_gmt":"2024-11-04T11:36:12","guid":{"rendered":"https:\/\/lemezmunkak.hu\/?page_id=394"},"modified":"2026-10-18T09:24:20","modified_gmt":"2026-10-18T09:24:20","slug":"szechenyi-plan-plus","status":"publish","type":"page","link":"https:\/\/lemezmunkak.hu\/en\/szechenyi-terv-plusz\/","title":{"rendered":"Sz\u00e9chenyi Plan Plus"},"content":{"rendered":"<p><main><\/p>\n<section class=\"lm-hero lm-hero--sub lm-hero--doc\">\n<div class=\"lm-wrap lm-hero__in\">\n<nav class=\"lm-crumbs\" aria-label=\"Breadcrumb\"><a href=\"\/en\/\">Home<\/a><span aria-hidden=\"true\">\/<\/span><span aria-current=\"page\">Sz\u00e9chenyi Plan Plus<\/span><\/nav>\n<h1>Technology development <span>at Gy\u00f6rgy-F\u00fcz\u00e9k Kft.<\/span><\/h1>\n<p class=\"lm-hero__lead\">GINOP_PLUSZ-1.2.3-21-2022-03516<\/p>\n<\/div>\n<\/section>\n<section class=\"lm-sec\">\n<div class=\"lm-wrap\">\n<article class=\"lm-doc\">\n<figure class=\"lm-doc__infoblokk\"><img loading=\"lazy\" decoding=\"async\" src=\"\/wp-content\/themes\/lemezmunkak\/assets\/img\/infoblokk.webp\" alt=\"Sz\u00e9chenyi Plan Plus \u2013 Government of Hungary \u2013 Co-financed by the European Union\" width=\"860\" height=\"248\"><\/figure>\n<dl class=\"lm-doc__facts\">\n<div>\n<dt>Project ID<\/dt>\n<dd>GINOP_PLUSZ-1.2.3-21-2022-03516<\/dd>\n<\/div>\n<div>\n<dt>Name of the beneficiary<\/dt>\n<dd>Gy\u00f6rgy-F\u00fcz\u00e9k Kft.<\/dd>\n<\/div>\n<div>\n<dt>Scope and objective of the development<\/dt>\n<dd>Technology development at Gy\u00f6rgy-F\u00fcz\u00e9k Kft.<\/dd>\n<\/div>\n<div>\n<dt>The amount of the contracted grant<\/dt>\n<dd>HUF 38,071,692<\/dd>\n<\/div>\n<div>\n<dt>Project completion date<\/dt>\n<dd>2024.02.02.<\/dd>\n<\/div>\n<\/dl>\n<h2 id=\"bemutatas\">A detailed description of the project\u2019s content<\/h2>\n<p>Developing the business sector\u2019s ability to adapt to accelerating technological, economic and social changes contributes to crisis-resilient and sustainable operations. Investment in capacity is therefore necessary. The rationale behind the planned project is to meet the ever-increasing quality and quantity requirements set by our customers. Our aim is to reduce the workload on our staff by introducing machinery, replacing manual labour with mechanised processes; the new machine operates faster and more accurately than the current one. There is less waste, and compliance with quality requirements is higher across our machinery.<\/p>\n<p>Capacity is currently limited, which means production lead times are long. To ensure reliable service for customers, it is necessary to increase capacity \u2013 that is, to acquire equipment that will enable the manufacture of products that meet demand at the right time. This development is justified because the new machinery will increase capacity and reduce production lead times, whilst improving the company\u2019s technological capabilities and resource efficiency.<\/p>\n<p>The use of new technologies helps to improve the efficiency of business processes.<\/p>\n<p>The company\u2019s main objectives are to improve the quality of its products and increase the efficiency of the manufacturing process through the continuous technological upgrading of its machinery. To enhance competitiveness through increased capacity and a broader product range, to ensure a more organised workflow, and to strengthen supplier potential. The machine is used in component manufacturing; it enables us to produce components that we were previously unable to manufacture. It also enables us to process larger raw materials; we can now carry out work that was previously outsourced to subcontractors in-house; and it enables us to manufacture components that require more precise workmanship.<\/p>\n<h2 id=\"koltsegelemek\">Relationship between cost elements and the activity to be developed<\/h2>\n<ul>\n<li><strong>Ermaksan PowerBend Falcon CNC-controlled press brake:<\/strong> Ermaksan\u2019s machines offer the optimal solution where bending quality, production line integration and the potential for automation are the key selection criteria. The specialised Delem software, or the equivalent Ermaksan ER press brake software and CNC controller, enables the operator to use the machine quickly and easily. It also enables us to process larger raw materials; we can now carry out work that was previously outsourced to subcontractors in-house, and we can also manufacture components that require greater precision.<\/li>\n<li><strong>Hall construction:<\/strong> The extension of the industrial hall provides an opportunity to increase production capacity. The new section of the building comprises an entrance area with a canopy, a closed materials store and an open, covered storage area.<\/li>\n<li><strong>Consulting:<\/strong> the development of a training plan based on the results of the diagnostic assessment, which is expected to lead to positive changes in the company\u2019s process system.<\/li>\n<li><strong>Training:<\/strong> The language training improves the English language skills of the employee concerned.<\/li>\n<\/ul>\n<figure class=\"lm-doc__figure\"><img decoding=\"async\" src=\"\/wp-content\/themes\/lemezmunkak\/assets\/img\/csarnok.webp\" srcset=\"\/wp-content\/themes\/lemezmunkak\/assets\/img\/csarnok-480.webp 480w, \/wp-content\/themes\/lemezmunkak\/assets\/img\/csarnok-720.webp 720w, \/wp-content\/themes\/lemezmunkak\/assets\/img\/csarnok-960.webp 960w, \/wp-content\/themes\/lemezmunkak\/assets\/img\/csarnok.webp 1400w\" sizes=\"auto, (max-width: 767px) calc(100vw - 50px), (max-width: 1279px) 702px, 752px\" alt=\"The new section of the hall at the Schweidel J\u00f3zsef utca site\" loading=\"lazy\" width=\"1400\" height=\"788\"><figcaption>The new section of the hall at the Schweidel J\u00f3zsef utca site<\/figcaption><\/figure>\n<p class=\"lm-doc__note\">(Based on European Commission Communication C(2020) 1863 final of 19 March 2020, \u201cTemporary Framework for State aid measures to support the economy in the current COVID-19 outbreak\u201d)<\/p>\n<\/article>\n<\/div>\n<\/section>\n<p><\/main><\/p>","protected":false},"excerpt":{"rendered":"<p>Kezd\u0151lap\/Sz\u00e9chenyi Terv Plusz Technol\u00f3gia\u00adfejleszt\u00e9s a Gy\u00f6rgy-F\u00fcz\u00e9k Kft-n\u00e9l GINOP_PLUSZ-1.2.3-21-2022-03516 Projektazonos\u00edt\u00f3 GINOP_PLUSZ-1.2.3-21-2022-03516 A kedvezm\u00e9nyezett neve Gy\u00f6rgy-F\u00fcz\u00e9k Kft. A fejleszt\u00e9s t\u00e1rgya, c\u00e9lja Technol\u00f3giafejleszt\u00e9s a Gy\u00f6rgy-F\u00fcz\u00e9k Kft-n\u00e9l A szerz\u0151d\u00f6tt t\u00e1mogat\u00e1s \u00f6sszege 38 071 692 Ft A projekt befejez\u00e9si d\u00e1tuma 2024.02.02. A projekt tartalm\u00e1nak r\u00e9szletes bemutat\u00e1sa A v\u00e1llalkoz\u00f3i szektornak a gyorsul\u00f3 technol\u00f3giai, gazdas\u00e1gi \u00e9s t\u00e1rsadalmi v\u00e1ltoz\u00e1sokhoz val\u00f3 alkalmazkod\u00f3k\u00e9pess\u00e9g\u00e9nek fejleszt\u00e9se hozz\u00e1j\u00e1rul [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-394","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/pages\/394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/comments?post=394"}],"version-history":[{"count":10,"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/pages\/394\/revisions"}],"predecessor-version":[{"id":517,"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/pages\/394\/revisions\/517"}],"wp:attachment":[{"href":"https:\/\/lemezmunkak.hu\/en\/wp-json\/wp\/v2\/media?parent=394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}